dev
Individual house
50 m2
Built
2020 - 2024
Schaerbeek
Individual house
50 m2
Built
2020 - 2024
Schaerbeek
The intervention focuses on two key aspects: the reconfiguration of external access and the optimisation of the attic
→ Voir le projetIndividual house
268 m2
Built
2016 - 2019
Schaerbeek
Individual house
75 m2
Built
2020 - 2022
Woluwe-Saint-Lambert
Transformation and extension of a single-family house, aiming to requalify the living spaces by enhancing natural light,
→ Voir le projetIndividual house
222 m2
Built
2021 - 2025
Schaerbeek
This transformation project focuses on restructuring the living areas and an upstairs bathroom.
→ Voir le projetIndividual house
250 m2
Built
2012 - 2014
Schaerbeek
Renovation and extension of a typical Brussels townhouse into a triplex oriented towards the garden.
→ Voir le projetIndividual house
30 m2
Built
2011 - 2012
Masnuy Saint Jean
Suite nuptiale, starting from a demanding volumetric configuration with an extremely limited usable space (1.5 m wide), a simple program, and open-minded clients seeking a unique project tailored
→ Voir le projetCollective housing
1774 m2
Ongoing
2024
Schaerbeek
The block located at the boundary between leisure spaces and the Terdelt garden city, is characterized by a large open space to the west
→ Voir le projetIndividual house
110 m2
Built
2012 - 2014
Ragnies
The project is structured as an assembly of cells with specific dimensions, each accommodating a part of the programme and responding to clearly defined uses.
→ Voir le projetIndividual house
268 m2
Built
2018 - 2021
Schaerbeek
The project transforms the ground floor of an existing building into an affordable, accessible housing unit for one or two people. It focuses on two main challenges:
→ Voir le projetSocial-cultural equipement
5000 m2
Competition
2020
Schaerbeek
The project proposes a multidisciplinary renovation of Le Botanique, aiming to enhance its character, functionality, and accessibility
→ Voir le projetSocial-cultural equipement
190 m2
Built
2018 - 2020
Forest
Renovation and adaptive reuse of a industrial building into a performing arts studio.
→ Voir le projetCollective housing
1280 m2
Competition
2023 - 2023
Molenbeek
The project transforms an existing building through a low-impact, circular approach, preserving its historic façade and structural clarity while limiting interventions.
→ Voir le projetSocial-cultural equipement
800 m2
Ongoing
2016
Walcourt
Renovation and extension of the Cultural Centre of Walcourt, adding a library, tourist office, screening room, workshops, and a shared reception area.
→ Voir le projetSocial-cultural equipement
1271 m2
Competition
2021 - 2021
Ixelles
Demolition of existing buildings and construction of a new mixed-use development combining a day-care centre and seven apartments.
→ Voir le projetIndividual house
100 m2
Built
2013 - 2018
Watermael-Boitsfort
This project transforms a narrow workers’ house, only 3.30 m wide, into a two-bedroom single-family dwelling within a highly constrained volume.
→ Voir le projetCollective housing
350 m2
Built
2019 - 2022
Schaerbeek
Renovation of a 1908 townhouse into social housing, developed within a constrained budget and timeline.
→ Voir le projetMixed-use
8333 m2
Competition
2021 - 2021
Molenbeek
Located in Molenbeek, the project reactivates a former industrial site through a mixed cultural and productive programme.
→ Voir le projetIndividual house
227 m2
Built
2018
Waterloo
This project transforms and extends a single-family house into an intergenerational home, with a two-level unit for the family and a single-level unit for the owner’s mother.
→ Voir le projetCollective housing
1282 m2
Competition
2021 - 2021
Koekelberg
The project develops 9 housing units within a very dense urban block, reusing the existing basement to limit excavation works and reduce costs.
→ Voir le projetIndividual house
350 m2
Built
2006 - 2008
Ixelles
Individual house
120 m2
Built
2016 - 2019
Evere
Creation of a single apartment in an existing house for an 87-year-old owner who wishes to remain in her home while adaptin
→ Voir le projetSocial-cultural equipement
1720 m2
Unbuilt
2018
Mons
The project reorganizes circulation, separates visitor and administrative areas, and gives the building a clear, new identity. The main hall showcases Materia Nova’s production in an industrial-
→ Voir le projetIndividual house
150 m2
Built
2009 - 2011
Anderlecht
Social-cultural equipement
4000 m2
Unbuilt
2011
Ixelles
The Marni theater project reorganizes circulation, capacity, and functionality while ensuring safety and accessibil
→ Voir le projetIndividual house
26 m2
Competition
2010 - 2010
Competition organized by the Académie des Beaux-Arts for the awarding of the Grand Prix of Architecture. In 2010,
→ Voir le projetMixed-use
266 m2
Unbuilt
2022 - 2024
Saint-Gilles
This project, winner of Renolab.B 2023, concerns the transformation and extension of a attached house located in Saint-Gilles. This renovation aims to create
→ Voir le projet